Uploaded on January 3, 2012 | Length 01:48 | Share
Views 18
Description: Yesterday night the first installation to be built by flying machines opened its doors to the public.
The installation, called "Flight Assembled Architecture", was conceived and built by teams led by my colleagues Fabio Gramazio & Matthias Kohler as well as Raffaello D'Andrea at the ETH Zurich. It illustrates a radically new way of thinking about materializing architecture: Use a multitude of mobile flying agents working in parallel and acting together as a scalable production means. As you can see in the video, the quadrocopters are programmed to interact, lift, transport and assemble small modules in order to erect a building.